House Building Cost Calculator – UAE
Here’s a comprehensive table outlining the key factors involved in estimating the cost of house building in the UAE. This table includes various aspects that can influence the overall cost.
Category | Details | Cost (AED per sq. meter) |
---|---|---|
Land Cost | Depends on location (Dubai, Abu Dhabi, Sharjah, etc.) | Varies widely (2,000 – 10,000 AED) |
Architectural Design | Fees for architects or design consultants | 100 – 300 AED |
Structural Engineering | Engineering services for structural integrity | 50 – 150 AED |
Government Fees & Permits | Municipality permits, planning approvals | 1,500 – 3,000 AED (fixed) |
Civil Works | Excavation, foundation, and structural framing | 500 – 1,500 AED |
Construction Cost (Basic Finish) | General cost for building the structure (blockwork, plastering, etc.) | 1,500 – 3,500 AED |
High-End Finishes | Premium materials for flooring, cladding, and interiors | 2,500 – 6,000 AED |
Electrical, Plumbing, & HVAC | Installation of electrical systems, plumbing, air conditioning | 500 – 1,200 AED |
Smart Home Systems | Home automation and smart technology integration | 300 – 800 AED |
Landscaping & Exterior | Gardens, driveways, fencing, swimming pools | 500 – 2,000 AED |
Furniture & Interiors | Furnishing, carpentry, and interior design | 2,000 – 5,000 AED |
Project Management | Hiring a project manager for coordination | 50 – 200 AED |
Miscellaneous Costs | Unexpected expenses, contingency fund | 5% – 15% of total cost |
Key Considerations:
- Location: Urban areas like Dubai and Abu Dhabi are more expensive in terms of land and construction costs.
- Finishes: Basic finishes are cheaper, while high-end and luxury finishes can significantly raise the cost.
- Size of the House: Larger houses will have lower cost per square meter compared to smaller, highly-customized homes.
- Labor: The cost of labor can vary depending on the complexity of the project.
- Government Regulations: Certain areas have stricter building regulations, which might add to costs.
- Time of Completion: Rush projects can increase labor costs due to overtime and expedited materials.