House Building Cost Calculator – UAE

House Building Cost Calculator – UAE

Here’s a comprehensive table outlining the key factors involved in estimating the cost of house building in the UAE. This table includes various aspects that can influence the overall cost.

CategoryDetailsCost (AED per sq. meter)
Land CostDepends on location (Dubai, Abu Dhabi, Sharjah, etc.)Varies widely (2,000 – 10,000 AED)
Architectural DesignFees for architects or design consultants100 – 300 AED
Structural EngineeringEngineering services for structural integrity50 – 150 AED
Government Fees & PermitsMunicipality permits, planning approvals1,500 – 3,000 AED (fixed)
Civil WorksExcavation, foundation, and structural framing500 – 1,500 AED
Construction Cost (Basic Finish)General cost for building the structure (blockwork, plastering, etc.)1,500 – 3,500 AED
High-End FinishesPremium materials for flooring, cladding, and interiors2,500 – 6,000 AED
Electrical, Plumbing, & HVACInstallation of electrical systems, plumbing, air conditioning500 – 1,200 AED
Smart Home SystemsHome automation and smart technology integration300 – 800 AED
Landscaping & ExteriorGardens, driveways, fencing, swimming pools500 – 2,000 AED
Furniture & InteriorsFurnishing, carpentry, and interior design2,000 – 5,000 AED
Project ManagementHiring a project manager for coordination50 – 200 AED
Miscellaneous CostsUnexpected expenses, contingency fund5% – 15% of total cost

Key Considerations:

  1. Location: Urban areas like Dubai and Abu Dhabi are more expensive in terms of land and construction costs.
  2. Finishes: Basic finishes are cheaper, while high-end and luxury finishes can significantly raise the cost.
  3. Size of the House: Larger houses will have lower cost per square meter compared to smaller, highly-customized homes.
  4. Labor: The cost of labor can vary depending on the complexity of the project.
  5. Government Regulations: Certain areas have stricter building regulations, which might add to costs.
  6. Time of Completion: Rush projects can increase labor costs due to overtime and expedited materials.