| Design and Planning | 5,000 – 10,000 |
| Site Preparation | 3,000 – 7,000 |
| Excavation and Foundation | 10,000 – 20,000 |
| Bricks | 1,000 – 1,500 per 1000 bricks (depends on quality and type) |
| Cement | 80 – 100 per 50kg bag (depends on brand and quality) |
| Sand | 300 – 500 per cubic meter |
| Reinforcement Bars (if needed) | 5,000 – 10,000 |
| Labour | 200 – 400 per day per worker (depends on skill level and location) |
| Tools and Equipment | 2,000 – 5,000 |
| Finishing Materials (e.g., paint) | 1,000 – 3,000 |
| Contingency | 5-10% of total cost |
| Total | Depends on wall height, length, design, and material quality |